facebook logo
  • Bhote Koshi-5 Hydroelectric

    The Bhote Koshi-5 Hydroelectric was first identified by Nepal Electricity Authority (NEA) during Screening and Ranking study of Medium Hydropower Study Project (MHSP) at reconnaissance level.

  • Kalika Construction

    "A" class construction company of Nepal

  • Koshi Bridge

    Foremost DR 40(in photo) cased Drilling Rig was imported exclusively for this job (Only 7 numbers of DR-40 has been manufactured till date and it may be the frst in whole south Asia).

We are proud to deliver projects that shape our communities and strengthen our nation's infrastructure.

Recent Project

Koshi Bridge

Koshi Bridge

This is a very important Bridge for the people of Eastern part of Nepal. 261m long Koshi Bridge has built over the Koshi River. Foremost DR 40 (in photo) cased Drilling Rig was imported exclusively...

Sikta Irrigation

Sikta Irrigation

Sikta Irrigation Project is National pride at the mid-western part of Nepal. Having successfully completed 12 km of Sikta-I and 17 km of Sikta-II, Kalika has been now awarded Sikta-III.

KUKL Water Transmission

KUKL Water Transmission

"Kathmandu Upatyaka Khanepani Limited" is an ambitious project to supply 2.6 million population of Kathmandu with clean drinking water. Kalika has Completed the work of construction...

Arun River bridge

Arun River bridge

Under the Rural Aceess Programme (RAP), it is design and build 120 m single span steel Truss bridge over Arun River. The bridge will access to connect two hilly people from Dankuta to Bhojpur districts.

Kalika Construction

From being number one construction company in Nepal, Kalika Construction continues to excel in construction field through its leadership skills. It sets a benchmark in South East Asia by diversifying from cash contracts to projects development. Kalika wants to win and promote various infrastructure development projects through partnership with domestic and international stake holders.